Mining & Resources
Control-system, HMI, SCADA, E&I and commissioning support for mining fixed plant, process areas, site utilities, stockyards and brownfield operational assets.
Mining sites often include mixed generations of PLCs, HMI / SCADA systems, motor-control equipment, fieldbus networks, vendor packages and site-specific operating constraints. Practical support needs to consider production risk, shutdown windows, field conditions, operator usability and future support.
- Mixed generations of PLCs, SCADA and vendor package systems
- Changes that must fit short shutdown windows
- Stacker, reclaimer and fixed plant control
- Running states, production events and stop reasons defined differently across systems
Typical plant areas
- Crushing and screening
- Conveyors and transfer stations
- Stackers, reclaimers and stockyards
- Wet and dry mineral processing
- RO plants and site utilities
- Vendor packages and package control systems
- Brownfield PLC, HMI and SCADA systems
Control System Reverse Engineering & Rebuilds
Analyse existing PLC and SCADA systems, rebuild missing data and documentation, and deliver runnable rebuilds.
Engineering Data & Plant Digitalisation
Asset hierarchies, data dictionaries and event definitions that give digital applications reliable plant data.
Commissioning, Diagnostics & Operational Support
Commissioning, fault investigation and ongoing operational support, on site and remote.

RO Plant Reverse Engineering, Rebuild and SCADA Integration
Standalone RO package reverse engineered and documented, its control logic rebuilt to the main plant standard, and the plant integrated into the main SCADA with motor-control and device visibility.

Intermittent PROFIBUS Fault Investigation
Long-running random communications dropouts and phantom trips isolated using network diagnostics and custom PLC diagnostic logic.

Mineral Process Plant Optimisation
Reclaim-time reduction, throughput improvement and stockpile modelling optimisation across fixed plant and mobile materials handling equipment.

Discuss your existing system or next project